Egyptian National Railways

Trial

Tickets Reservation
Train Schedule
Facebook
Google Play
YouTube
Contact Us

News Details

the Minister of Transport witnesses the signing of a memorandum of understanding between Egyptian National Railways and International Thales

29/09/2021

During his visit to Spain, Lieutenant General, Eng. / Kamel Al-Wazir, Minister of Transport, witnessed the signing of a memorandum of understanding between Egyptian National Railways and International Thales Spain Company to study the implementation of the duplication and the development of signaling and communication systems on Qalyoub / Shebin El-Qanater / Zagazig line with a length of 65 km, besides the modernization of the central control tower in Shebin El-Qanater to include the entire line from Qalyub to Shebin al-Qanater; as well as the development of Qalyub/Menouf/Tanta line with a length of 94 km to include the development of signaling systems from the mechanical system to a modern electronic system holding the latest safety factors with (SIL 4) system  besides the complete duplication of the line and the establishment of a central control tower at Menouf station to control the entire line; the financing will be from the Spanish side through (EPC+F)system.
Eng. Mustafa Abu Al-Makarem, ENR Chairman, signed on behalf of the Egyptian side while Eng. Jesus Sanchez, CEO of Spain Thales Company, signed on behalf of the Spanish side.
The Minister of Transport stated that this signature comes in light of the ministry's interest in modernizing the infrastructure and signaling systems on railways lines, including high-density suburban single lines with the flow of heavy traffic, noting that the modernization of railway signaling systems aims to replace the current (mechanical) system with a modern electronic one, increase the number of journeys per day, and achieve the highest levels of safety and security.
He added that the modernization of the communication system includes monitoring the trains moment by moment; providing level crossings with bells, lights and automatic barriers to reduce accidents and achieve safety for vehicles; and a system that allows the driver to contact the operation monitor from any semaphore in cases of emergency or sudden malfunctions. He pointed out that projects for the modernization of signaling systems on railways lines with a length of about 1,900 km and at a cost of more than 50 billion pounds are being implemented to increase safety and security rates on railways lines.
It is worth mentioning that Spain Thales Company is currently developing signaling and communication systems on the lines of Cairo / Alexandria with a length of 208 km and Asyut / Sohag / Naga Hammadi with a length of 250 km.