Land Due Diligence ReportBeba (SER-1)Beni Suef - Asyut lineSeptember 2021
08/05/2022
Invitation to attend a public consultation session on the project “Development of the (Bashtil/ Itai Al Baroud/ Al Qabbary) line and the establishment of a line linking Al Manashi Line and the Dry Port in 6 October City”
28/04/2022
Land Due Diligence Report Dayrout (SER-18) (Signaling modernization project on Beni Suef – Asyut line)September 2021
13/04/2022
Announcement of the passenger maintenance project, management and operation of Abu Radi workshops
02/03/2022
A contract for the management and operation of railway freight transport services in Egypt
01/02/2022
Land Due Diligence Report Manqabad (EIS) Beni Suef – Asyut line September 2021
17/01/2022
“Land Due Diligence Report – Matai SER 9(Signaling modernization project on Beni Suef – Asyut Line) March 2021 “
28/12/2021
Environmental and social Impact assessment (ESIA) for upgrading Tanta-El Mansoura-Damietta railway line
08/08/2021
Supplying 110 Locomotives and rehabilitation of 181 locomotives
01/12/2020
Supplying 1300 new stainless steel coaches
01/12/2020
Supplying (7) Train Sets Including Maintenance & Spare Parts
30/11/2020
Supplying 100 locomotives financed by EBRD
30/11/2020
Supplying 50 new locomotives, upgrading 50 Henchel Locomotives,
30/11/2020
Supplying 40 power coaches and extension for another 60 coaches, totally becomes 100 coaches
28/11/2020
manufacture and supply (200) sleeping coaches of the latest international specifications.
26/11/2020
Improving the outer and interior appearance of 200 coaches (Motawara)
26/11/2020
Raising the efficiency of the air-conditioning and improving the box for 90 first-class Spanish coaches + 45 second-class coaches)
26/11/2020
Project of Modernizing Signalling Systems on Naja’ Hammadi / Luxor line, with a length of 118 km
24/11/2020
Electrifying Signalling of Tanta /Al-Mansoura / Damietta of 119 km, Kafr Al-Batikh/Damietta Port link of 5k 124
24/11/2020
Modernization of signalling systems on the Luxor - High Dam line, including permanent way of 224 km long
24/11/2020
Electrification of signalings in Assiut / Sohag / Naga Hamady, with a length of 181 km
24/11/2020
Signal systems development On Cairo / Alexandria line, with a length of 208 km
24/11/2020
Development of signaling system Banha – Port Said – 214 K.m
24/11/2020
Electrification of signalings in Beni Suef / Assiut, with a length of 250 km
24/11/2020
Project of securing signal towers with camera surveillance systems
18/11/2020
Developing Control & Operation Systems for 1120 Level Crossings
17/11/2020
Imbaba historical bridge on the Nile
17/11/2020
The project of condtructing siwa / matruh / gergoub railway line 300 Km long
17/11/2020
The project to extend the Cairo-Aswan railway to Toshki as well as linking the railways with the state of Sudan for about 250 km
17/11/2020
The project of constructing El Manashi/6th of October railways link 49 km long
17/11/2020
The project of Doubling the tracks of Qalioub/ Menouf /Tanta line 94 km long
17/11/2020
The project of signals and communication systems modernization along Tanta/Mansoura/Damietta line 119 KM Long
17/11/2020
The project of constructing El Rubiki/10th Ramadan line 69 Km long
17/11/2020
The civil development of 1102 level crossing
17/11/2020
the station development project
17/11/2020
Supplying (4) railway maintenance machines
16/11/2020
Supply and maintenance of (1) track diagnostic machine
16/11/2020
Supply of 12 new track machine
16/11/2020